Bridge Footpath – Brisbane

Canvey Road, Upper Kedron

216m2 Applied to concrete.

The Situation: A road bridge was being constructed over a creek, to provide access to a new housing estate, and the surface needed waterproofing (Stage 1 - footpath).

The Solution: A cold spray-applied membrane was sprayed at 2mm across the footpath area of the new bridge, directly onto the concrete.