Corrugated Tunnel – Middlemount

June 14, 2010 by Roslyn · Leave a Comment 

Middlemount Coal Reclaim Tunnel

approx. 2000m² Applied to corrugated steel tunnel
before Liquid Boot coating
Liquid Boot coating tunnel with Liquid Boot coating

Reservoir Lining Repairs – Hunter Valley

February 24, 2010 by Roslyn · Leave a Comment 

Charlestown Reservoir, Hunter Valley, NSW

186m2 Applied to portions of concrete water supply reservoir

Swimming Pool Repair – Brisbane

February 24, 2010 by Roslyn · Leave a Comment 

198 Royal Parade, Alderley

66m2 Applied to concrete pool surface.

Roof Waterproofing – Sydney

February 23, 2010 by Roslyn · Leave a Comment 

Telephone Exchange Roofs – Homebush, Campbelltown and Narellen, NSW

Varying areas applied to existing roof and gutter surfaces.

Bridge Footpath – Brisbane

February 23, 2010 by Roslyn · Leave a Comment 

Canvey Road, Upper Kedron

216m2 Applied to concrete.

Land Bridge Waterproofing – Brisbane

February 23, 2010 by Roslyn · Leave a Comment 

Hamilton Road Upgrade Landbridge, McDowell

609m2 Bridge deck and sides.

Surge Tank Waterproofing – Mt Isa

February 23, 2010 by Roslyn · Leave a Comment 

Xstrata Copper Surge Tank Re-lining

1350m2 Applied to geotextile and steel.

Basement Waterproofing – Beachfront House

February 2, 2010 by Roslyn · Leave a Comment 

22 Iluka Rd, Palm Beach, NSW

326m2 applied to concrete walls and floor

Iluka Road - beachfront house basement waterproofed with Liquid Boot

Tunnel Waterproofing – near Pannawonica, WA

February 2, 2010 by Roslyn · Leave a Comment 

Steel Arch Culverts, Deepdale Rail Line Bridge, WA

1920m2 Waterproofing as Protective Coating over two steel arch structures used as rail bridge culverts

steel arch culverts waterproofed with Liquid Boot at Pannawonica

construction of the steel arch tunnels for rail bridge culverts near Pannawonica close-up - Liquid Boot application to first rail culvert tunnel complete

Basement Waterproofing – Carpark behind Seawall

February 2, 2010 by Roslyn · Leave a Comment 

Point Piper, Sydney

3425m2 Waterproofing Membrane applied to basement carpark excavated from behind sandstone seawall abutting Sydney Harbour

basement behind seawall waterproofed with Liquid Boot

Next Page »

Recent Photos From 2. Waterproofing

Swimming Pool Repair – Brisbane Roof Waterproofing – Sydney Bridge Footpath – Brisbane Land Bridge Waterproofing – Brisbane Surge Tank Waterproofing – Mt Isa Basement Waterproofing – Beachfront House Tunnel Waterproofing – near Pannawonica, WA Basement Waterproofing – Carpark behind Seawall