Corrugated Tunnels – Grosvenor

Grosvenor Drift Tunnels

approx. 4800m2 Applied to corrugated steel plate tunnels

CV Drift Tunnel construction

CV Drift Tunnel under construction

CV Drift Tunnel - cold spray-applied membrane application

CV Drift Tunnel – cold spray-applied membrane application

M&M Tunnel ready for coating

M&M Tunnel ready for coating

M&M Tunnel with cold spray-applied membrane coating

M&M Tunnel with cold spray-applied membrane coating

The situation: The Grosvenor Coal mine, some 5 km north of Moranbah in the Central Queensland coalfields, had new transport (M&M) and conveyor (CV) drift tunnels being constructed and they required waterproofing to protect them from both leakage and rust.

The solution: The outer surfaces of the tunnels were sprayed with a coating of a cold spray-applied membrane to a nominal thickness of 2mm. The result was a smooth, even, waterproof, cold spray-applied membrane surface over both of the tunnels, ready for backfilling.